Product Description
Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
Super Sludge Dehydrator Mechanism
The condtioned sludge flows into the filter chamber from the flocculation tank and is pushed forward the discharging end .
With the gap between the thread of the shaft is getting higher and higher.
Then the water is separated from the sludge and flows out from the gap between the movings and the fixed rings.
The movement of the moving rings the fixed rings cleans the gap between them and prevent the machine from blockage.
The filtered sludge cakes are pushed forward by the shaft and finally discharged from the end
Super Sludge Dehydrator Fabricate Process
Super Sludge Dehydrator Work Process
1. The sludge is transported to the inlet by sludge conveyor.
2. The sludge are transported to the flocculation tank through metering tank, and adequately mixed by the mixer.
3. After big flocs are formed, the sewage is transported to the screw press.
4. Flocs moves from the concentration zone to the dewatering zone by gravity.
5. Gaps between moving rings and fixed rings narrows, and the pressure of the end plate increases dewatering and finally discharge the sludge cake.
Super Sludge Dehydrator Technical Data
Super Sludge Dehydrator Technical Drawing
Super Sludge Dehydrator Details
Application of Super Sludge Dehydrator
Municipal Sewage
Slaughter House
Metallurgical Industry Wastewater
Oily Wastewater
Printing & Dyeing Sewage
Metal-Processing Sewage
Mining Stone Wastewater
Electronic Sewage
Related Product