Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment

Product Details
Customization: Available
Method: Physical Treatment
Usage: Industrial, Hospital, Municipal
Manufacturer/Factory, Trading Company
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Plant Area
501~1000 square meters
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
  • Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment
Find Similar Products

Basic Info.

Model NO.
SSD-201
D.S
18-30 Kg/H
Transport Package
Wooden Case
Specification
1860*750*1080mm
Trademark
ECOPRO
Origin
Wuxi City, Jiangsu Province
Production Capacity
500 Sets/Year

Product Description

        Screw Press Super Sludge Dehydrator for Municipal Waste Water Treatment 

Super Sludge Dehydrator Mechanism
The condtioned sludge flows into the filter chamber from the flocculation tank and is pushed forward the discharging end .
With the gap between the thread of the shaft is getting higher and higher.
Then the water is separated from the sludge and flows out from the gap between the movings and the fixed rings.
The movement of the moving rings  the fixed rings cleans the gap between them and prevent the machine from blockage.
The filtered sludge cakes are pushed forward by the shaft and finally discharged from the end


Super Sludge Dehydrator Fabricate Process



Super Sludge Dehydrator Work Process
1.  The sludge is transported to the inlet by sludge conveyor.
2.  The sludge are transported to the flocculation tank through metering tank, and adequately mixed by the mixer.
3.  After big flocs are formed, the sewage is transported to the screw press.
4.  Flocs moves from the concentration zone to the dewatering zone by gravity.
5.  Gaps between moving rings and fixed rings narrows, and the pressure of the end plate increases dewatering and finally discharge the sludge cake.




Super Sludge Dehydrator Technical Data


Super Sludge Dehydrator Technical Drawing



Super Sludge Dehydrator  Details


Application of Super Sludge Dehydrator
Municipal Sewage
Slaughter House
Metallurgical  Industry Wastewater 
Oily Wastewater
Printing  & Dyeing Sewage
Metal-Processing Sewage
Mining Stone Wastewater
Electronic Sewage


Related Product




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier