Daf Dissolved Air Flotation Heavy Duty for High Concentration Wastewater Treatment
Contact Supplier
Product Attributes
- Customization
- Available
- After-sales Service
- 1year
- Warranty
- 1year
- Model NO.
- DAF
- Type
- Flotation Machine
- Method
- Physical Treatment
- Usage
- Industrial
- Transport Package
- Wodden Package
- Specification
- customized
- Trademark
- Ecopro
- Origin
- Shanghai
- Production Capacity
- 500/Week
Product Images of Daf Dissolved Air Flotation Heavy Duty for High Concentration Wastewater Treatment
Find Similar Products
Product Description


2. Subsurface capture
3. Automatic slagging controlled by liquid level
4. Non-clogging releasing with high efficiency.
Slaughter House
Metallurgical Industry Wastewater
Spraying Sewage
Printing & Dyeing Sewage
Metal-Processing Sewage
Mining Stone Wastewater
Electronic Sewage
SS content (ppm or mg/L)
Oil & Grease &Fat & FOG content (ppm or mg/L )
PH (6~9 is preferred . Otherwise consider PH adjust tank before DAF tank , also have to consider the material of the DAF because of Corrosive substance )
BOD (ppm or mg/L)
COD (ppm or mg/L)





Q2: Why does my device charge slowly?
About the Supplier
Company Profile
Shanghai Ecopro Environmental Engineering Co., Ltd founded in the June of 2017. Prior to HK ECOPRO establish in 2015. Located in Pudong district Shanghai China. With registed capital 800, 000USD
Our Mission: To be your one-stop faithful partner of water and wastewater solution. Present leading equipments of environmental field.
Our Principle: According the project or clients requirement. Customized proposal for one-stop full line water and wastewater solution.
Main Products: Polymer Dosing System, Dissolved Air Flotation, Sludge Dehydrator, Screw Press, Filter Press, Electrical Flocculation System, Enamel Assembly Tank and different kinds of Screens, as well as Mutag-Chip Biomedia from Germany.
Our Service: Professional project proposal; Superior product quality; Fast and professional aftersales.
After Sales:
In need of repair services, please inform the machine model and manufacturing numbers engraved on the nameplate.
Even within the warranty period, the items beyond the scope of the warranty are all paid services.
After warranty period, the cases that the function of the machine through the maintenance can be maintained are paid services, which according to customer needs.
After the maintenance of machine, reusable components will be recycled.
About Our Factory & Business Background
- Address
- 3th, No. 255 Xinjinqiao Road, Shanghai, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays - Nearest Port
- Shanghai Port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2017-08-01
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Send your message to this supplier
People who viewed this also viewed
-
US$20.00-298.00 / Piece
-
US$698.00-1,969.00 / Piece
-
US$13,608.00-22,506.00 / Piece
-
US$200.00-1,969.00 / Piece
-
US$200.00-432.00 / Piece
-
US$189.00-1,529.00 / Piece
-
US$698.00-1,969.00 / m3
-
US$698.00-1,969.00 / m3
-
US$6,515.50-6,915.50 / Piece
-
US$5,298.00-10,980.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Dissolved Air Flotation
- Daf Dissolved Air Flotation Heavy Duty for High Concentration Wastewater Treatment
Related Categories
Hot Searches
- Treatment Product Factories
- Water Treatment System Factories
- Treatment Equipment Factories
- Water Treatment Products
- Water Treatment System Machine
- Automatic Water Treatment
- Water Treatment Components
- Sewage Water Treatment
- Water Pre Treatment
- Wastewater Treatment Bulkbuy